Projects

Larger projects as of November 20, 2024

Dates are in YYYYMMDD format.

GroupProjectActionTimeframeStatusNotes
Motor/fuelCoolant hoseReplace202205CompletedWesterbeke hose kit ordered, received.
Motor/fuelOil and filterReplace202206TO DOUnclear when last service was performed.
Motor/fuelFuel filtersReplace202206TO DOUnclear when last service was performed.
Motor/fuelFuel sending unitReplace202206CompletedSending unit replaced. Stripped screw fixed 20220731.
ToiletToiletReplace202204CompletedReplaced and tested. Old mounting holes filled with Marine-Tex.
ToiletTankReplace202207CompletedCrack found 20220607. Installation completed 20220714.
LinesTopping lift cablePurchase202206CompletedReceived 202207. Stored on board.
LinesTopping lift cableReplace202206CompletedEvergreen Rigging replaced old with Dyneema.
LinesBoom hangersPurchase202206CompletedReceived from MQYR.com. Stored on board.
LinesBoom hangersReplace202306TO DOReady for rigger.
LinesTopping lift aft blocksReplace20230640%Ready for rigger.
LinesTopping lift forward blocksReplace20230680%Ready for rigger.
LinesTopping lift lineReplace20230680%Ready for rigger.
LinesTopping lift soft shackleAdd20230680%Ready for rigger.
HatchMain hatchReplace20230760%Vetus hatch from Fisheries Supply received 20220608.
Rudder/keelEmergency tillerReplace202205CompletedStored on board.
Rudder/keelRudder supports, keelRepair202206CompletedKeel repaired, bottom painted, rudder supports judged OK.
ElectricalBatteries, charging systemEvaluate202206CompletedBatteries in good condition. Age unknown.
ElectricalOvercurrent protectionPlan202206TO DOFollow-up on issues found in 202203 survey.
DinghySaturn PVC inflatableEvaluate202205CompletedTubes hold air, floor leaks air, slow water leak in bottom.
DinghyAchilles Hypalon inflatablePurchase202205CompletedAchilles LT4 received 20220511, not tested.
DinghyTorqeedo Travel 801 motorEvaluate202205CompletedMotor works, batteries do no hold charge.
DinghyHonda 2.3 short shaftPurchase202205CompletedDelivered 20220512, not tested.
Dinghy7' OlympianPurchase202305Completed$400
Dinghy7' OlympianRepair202305TO DOReplace oar sockets, purchase new oars
OtherBilge pump/switchReplace202206CompletedPump and switch malfunctioned. New units installed.
OtherRename boatPlanning202206TO DOSwoose to be renamed Narwhal. Existing lettering is vinyl.
LinesMain halyardReplace202306TO DO

svnarwhal icon 128px